المحاسبة عن المشارکة کاحد الصيغ البديلة لتمويل المشروعات التي تعمل وفقا لعقود البناء و التشغيل و نقل الملکية (B.O.T) مع دراسة تطبيقية


1. AL.azemi,K and Bhamra.R." Risk management for build- operate and transfer (BOT) progects in Kuwait ", Journal of Civil Engineering and management 20 (3) , 2014, Loughborough University Institutional Repository.
2. Ammad Hassan Khan, Mudassar Sattar, Misbah Jamil : "The Trend of Build Operate and Transfer (BOT) Projects inPakistan",FirstInternational Conference on Construction In Developing Countries (ICCIDC–I) “Advancing and Integrating Construction Education, Research & Practice”August 4-5, 2008, Karachi,, Pakistan.
3. Build – Operate – Transfer (BOT) Model, centeral Business solutions, LLC, http//www.cbsinfosys.com, seen at 5pm date 7/6/2016.
4. David A.levy " BOT and public procurement Aconceptual Framwork ",IND.INT,L &com.L.Rev, Vol 7:1, 1996
5. Emmanuelle Auriol and Pierre M.Picard: " A Theory of BOT concessioncontracts",March,2011,http//www.idei.fr/sites/default/files/medias/doc/wp/2011/theoryea.pdf .
6. http//www.Kau.edu.com.
24
7. Marjan Bashiri and others,"Analytical comparison between BOT,BOOT and PPP project delivery systems", http//www.mabaforum.ir/download/mba/pm/6th/322.pdf
8. Raja Abdkarim ," Malazysia,s BOT Method implementation for highway development projects", Master of Science in international cooperation policy, Ritsumeikan Asia Pacific University, March, 2012.
9. S.Mubin and A.Ghaffar:" BOT contracts : Applicaiblity in Pakistan for Infrastruture development",Pak J.Engg&Appl.sci vol 3 Jul 2008, University of Engineering and Technology, Lahore , Pakistan.
10. SUDKI M. JAD :"Build, Operate, And Transfer (BOT) Project Development System In Saudi Arabia", King Fahd University of Petroleum and Minerals,2005.
11. Sebastiaan Menheere and SpiroN.Pollalis,"Case Studies on Build,Operate,Transfer",Delft University of Technology Faculty of Architecture, The Netherlands,1996